THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.

As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA., This news data comes from:http://www.xs888999.com
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- Former president Duterte's health stable despite high blood sugar, says VP Sara
- ChatGPT to get parental controls after teen's death
- Hontiveros pushes P15,000 salary hike for teachers
- Artikulo Onse' group calls for independent panel to probe flood control corruption
- Sara slams govt corruption probe as a 'political zarzuela,' to meet with Robredo at Bicol festival
- Putin threatens to target Western troops in Ukraine
- Lawmaker linked to anomalous flood control projects in US for medical reasons, says House spokesman
- Pope Leo meets LGBTQ+ Catholic advocate and vows continuity with Pope Francis' legacy of welcome
- DPWH fires Bulacan engineers, blacklists contractors over anomalous projects
- ‘Gomez ignorant of how media works’